Entry 14 · 13–29 May 2026 · 1 min read
Small tests, safer exports, an open centre hole
- technology
- debugging

On 13 May, a roughly 76 mm / 3-inch test-disc option was added for smaller trial objects. On 27 May, guards were added for missing or invalid calibration samples, and an empty-export bug was traced to geometry counts being read after their source arrays had been cleared. Counts were changed to come from the final typed arrays.
The centre hole needed several attempts on 29 May: align the raised label with the hole wall, keep the internal cavity annular instead of letting its floor cap the hole, and correct the inner-wall triangle direction. The record shows iterative diagnoses and reported fixes—not a single instant solution or independently established physical success.
This entry's particle study is decorative — not measured audio or a simulation of printed playback.